The main challenges were to design and construct a bridge that did not obstruct the view of the old Vivekananda Setu and that did not dwarf the historically important Dakshineswar Kali Temple located well within visible distance. It also had to last at least half a century and carry substantially higher levels of fast traffic connecting Kolkata and Howrah. It is a 6-lane, 880 m long bridge.