We have designed and constructed the 3rd bridge across River Mandovi in Panaji, Goa between the Pundalik Nagar and Merces junctions. The 660 m long, 4-lane bridge has 40 cables anchoring the segments to the four pylons that are grounded into the riverbed. It features 465 piles, marine pile cap coffer dam works using 1200 mm dia, 25 m long steel liners, prefabricated rebar pier cap cages for all viaduct piers and rebar lifter for pylon & pier works.