The 400 kV D/C (Quad) transmission line that originates from Barh-II TPS in Bihar and stretches to Gorakhpur (Shajanwa Substation) in UP is for an Immediate Evacuation System associated with the Barh-II Thermal Power Station. Divided into 2 packages, we executed the second tower package TW-02 that spread across two states: 103 km in Uttar Pradesh and 74.7 km in Bihar featuring 12 power line crossings, 1 major river crossing, 3 highways and 3 railway crossings, 486 towers weighing 14099 MT with a foundation volume of 38112 cum.