Considering the huge requirement of power transfer, in particular, and other challenges like RoW, environmental issues, coordinated development of transmission corridors, reduction of losses, etc., M/s. PGCIL felt the need for a 1200 kV (UHVAC) system in India. We therefore constructed the 1200 kV Transmission System and 1200 kV Test Station at an existing PGCIL substation at Bina, Madhya Pradesh. Our mandate involved detailed engineering, integration and execution, supply of insulators, conductors, hardware, cabling, earthing, lighting and other items, all civil and structural works, including equipment foundations and structures.