We replaced the existing 115 kV electrical power supply system with a new power system that involved the construction of 230 kV Double Circuits, overhead transmission lines / power cables from the Wasit Cogeneration substation with associated gantries and transmission yards up to the beach transition yard at Khursaniyah area and from the Abu Ali Plant 230 kV substation with associated gantries and transmission yards up to the beach transition yard on the Abu Ali Island. We did detailed design, engineering, site investigation, survey, material procurement, transportation, installation, as-built documentation, training, mechanical completion and pre-commissioning of the onshore facilities.