It was India’s first indigenous 700 MW Pressurized (Heavy) Water Reactor (PHWR) and our scope included Main Plant Civil Works, Common Service Piping Works, construction of NDCT & IDCT on an EPC basis, construction of the Turbine Building Electrical Bay, building the Switchyard on a EPC basis and the instrumentation works.