We have constructed a new regulator across the Coleroon River and a 7 km road connecting Mukkombu Barrage to the Butterfly Park and Osipalayam Barrage. The innovative barrage featured 55 gates operated through a hydraulic system, a departure from the conventional wire-rope system.