One of the most prominent treatment plants in Qatar, this STP has a capacity to treat 241 million litres of sewage water per day. The plant, built by the L&T-Galfar JV, features advanced techniques such as Sequential Batch Reactor, Ultra Filtration, Sludge Handling Systems that produce high quality treated water, which is pumped through treated water networks to be used for irrigation and cooling purposes. The plant is also run by advanced systems and electronic programmes with minimum technical intervention by engineers and workers. This project was declared the National Winner for Best Power and Water Project of Qatar by MEED and was also felicitated by the client ASHGHAL for achieving 7.7 Mn safe man-hours.