The existing package treatment plant (PTP) was replaced with central sewage treatment works (STW) to serve the Al Shamal township and the neighbouring areas for a design horizon of 2030 and beyond. The plant features advanced techniques such as Sequential Batch Reactor, Ultra Filtration, UV Disinfection & Sludge Handling Systems and operated with advance automated systems for plant control and operations.