This is a prestigious project that aligns with the CPHEEO (Central Public Health and Environmental Engineering Organisation) norms of providing 135 liters per capita per day (LPCD) to the urban category, aims to produce 120 MLD (Million Liters per Day) of treated water from our sophisticated Water Treatment Plant, situated upstream of the EB Barrage. The treated water will be conveyed through pipelines to five pumping stations, along with substantial Ground Level Storage Reservoirs and additionally directed to 47 existing and 21 proposed Elevated Level Service Reservoirs to cater to 1,30,000 residences via our House Service Connections.