We have exhibited our prowess in Engineering Systems Works for Mass Transit Systems in India, Middle East, and other neighbouring geographies.
In India, we have developed Systems Works for Metro Rail Systems in Delhi, Hyderabad, Chennai, Lucknow, Mumbai and Ahmedabad. Most notably, we implemented Phases 1, 2 and 3 of Delhi Metro, Hyderabad Metro, Chennai Metro, Lucknow Metro in record time that included Design-and-Build of 25 kV Over Head Electrification (OHE), Rigid Overhead Contact System (ROCS) and Ballastless Track Works.
In the Middle East, for the Riyadh Metro Lines 1 & 2, we have Design-&-Built Ballastless Track System (113 tkm of Ballastless Tracks including Resilient System in Tunnels and Twin Block Slab Track in 3 depots).
In Dhaka, Bangladesh, we are executing the Dhaka Metro Line that is 20 km long with 16 stations.
The Design & Build scope involves multiple systems across various domains, Overall System Integration and Maintenance Support.
Track works
Ballastless Track Work in operational sections (43 Tkm) | Depot Track (19 Tkm)
Electrification Works
Signalling, Train Control & Telecom
Auxiliary Systems